Modifying an existing Work Package

Modifying a Work Package that belongs to an unlocked project (Admin determines this), is accomplished by simply modifying the data that is already there. Notebook fields can be updated with new information whenever applicable.

To modify anything in a table (Estimates, Schedule, and Potential Risks), select the pencil icon to the right of the desired element to be modified, seen below.

A Work Package can also be moved using the Cost Estimating Form section. Using the circular arrows in the top right of the screen, a Work Package can be assigned, moved, copied, renamed, or deleted.

 